TransitMurreeEVM01

اردو میں دیکھیں

Green Electric Bus EVM01

GBS Murree to Barrian

9 stops. Fare Rs 20. Departure times are listed by direction.

First-stop departures from the timetable.

Plan on PakBus
Map of Murree Green Electric Bus route EVM01 from General Bus Stand Murree to Barrian.
Open full-size PNGOpen full-size PNG
Direction 1

GBS Murree to Barrian

First departure 06:15, last departure 21:15

  1. General Bus Stand Murree
  2. Sunny Bank
  3. Kuldana
  4. Sandhian
  5. Ratti Galli
  6. Darya Galli
  7. Kali Mitti
  8. Ratti Galli chowk
  9. Barrian
Direction 2

Barrian to GBS Murree

First departure 07:15, last departure 22:15

  1. Barrian
  2. Ratti Galli chowk
  3. Kali Mitti
  4. Darya Galli
  5. Ratti Galli
  6. Sandhian
  7. Kuldana
  8. Sunny Bank
  9. General Bus Stand Murree

Search PakStats